Mining excavator loading a haul truck at a Ghanaian open-pit gold mine
Ghana · Est. 2026LI 2431 Compliant · 100% Ghanaian Owned

We keep Ghana's mines running.

Fuel on time. Equipment on site. Chemicals delivered. Fleet tracked. YOKA MSS is Ghana's integrated mine support company — five service lines, one Ghanaian partner, zero foreign middlemen.

5
Service lines
100%
Ghanaian owned
30
Day mobilisation
GHS 0.50
Below retail fuel

What we do

Five service lines.
One Ghanaian company.

From the first litre of fuel to the final reagent delivery, YOKA MSS manages the operational dependencies that keep mines producing. Every service line is legally reserved for Ghanaian-owned companies under LI 2431.

01

Bulk Diesel Supply

Direct from licensed Bulk Distribution Companies to your site on a fixed weekly schedule — GHS 0.50/L below GOIL retail. No OMC middleman, no retail margin.

  • 54,000 L/week starting volume — scalable
  • Certificate of analysis on every load
  • Signed delivery note every trip
  • Emergency top-up within 24 hours

GHS 15.45 / litre delivered

02

Heavy Equipment Hire

Tippers, excavators, ADTs, dozers and graders on wet hire. Machine, operator, maintenance and insurance in one day rate.

  • 30-tonne tippers — $350–$500/day
  • Cat 336 excavator — $1,800–$2,800/day
  • ADT Bell B30E — $3,500–$5,500/day
  • 90% minimum uptime guaranteed

From $350 / day — wet hire

03

Mine-Spec Vehicle Hire

Hilux SR5, Land Cruiser 70 and crew buses — mine-specification from day one. ROPS, IVMS, amber beacon, reflective markings.

  • Mine-inducted drivers included
  • Live IVMS telematics on every unit
  • Scheduled servicing off-shift
  • Replacement vehicle on breakdown

From $130 / day

04

Haulage & Logistics

Ore, waste, consumables and plant moves between pit, plant, port and yard — planned, tracked and reported.

  • 100% on-time move target
  • GPS-tracked convoys
  • Port clearing coordination
  • Weekly logistics reporting

Contracted moves

05

Reagent Supply

Cyanide, lime, activated carbon and process chemicals under an ICMC-certified chain of custody.

  • ICMC certified handling
  • Sealed, documented custody chain
  • Scheduled monthly replenishment
  • Full batch traceability

Monthly contracted

Also included

Telematics & Data

Live fleet visibility, utilisation and fuel-burn dashboards for your logistics team.

Maintenance & Repair

Preventive servicing and 8-hour replacement SLA on contracted breakdowns.

Compliance

LI 2431, Minerals Commission licensing and ORC registration handled end to end.

The window

Why now

Ghana's mining sector is at record output — and the localisation deadline is fixed.

422.5M L

Mine diesel consumed in Ghana, 2025

6M oz

Ghana gold production 2025 — record high

$11B

Ghana gold export revenue, 2025

Dec 2026

LI 2431 compliance deadline

Fuel economics

GHS 0.50 below the pump

On 54,000 litres per week, your operation saves GHS 1.4 million annually.

Live diesel board
Fetching GOIL prices…
Loading live prices…
Source: GOIL published pump prices

Live feed · NPA-regulated · confirmed in contract

YOKA price to mineGHS 15.45 / L
GOIL / Total retailGHS 15.95 / L (NPA Jul 2026)
Saving per litreGHS 0.50 / L
Opening weekly volume54,000 litres
Annual saving (54K L/wk)GHS 1.4 million
Delivery scheduleFixed day(s), agreed in writing
Emergency supply24-hour call-out

What every delivery includes

  • Certificate of Analysis — density, flash point, sulphur
  • Signed delivery note — driver + site fuel supervisor
  • Calibrated tanker meter reading before and after
  • Water contamination check before every load
  • Ultra Low Sulphur Diesel — max 50 ppm
  • NPA-indexed pricing — margin fixed
  • Weekly delivery summary + monthly consumption report
  • Contracted backup tanker operator

Who we serve

Built for site operations

Large mines — Newmont, Gold Fields
Mining contractors — Rabotec, E&P
Drilling contractors
Exploration companies
Junior mines
Construction companies

Compliance

Fully Ghanaian. Fully licensed.

ORC Registered — Ghana
Minerals Commission Licensed
100% Ghanaian owned
LI 2431 fully compliant
Stanbic Bank Ghana — USD + GHS

Start here

The 90-day pilot. You take no risk.

Three services. Three KPIs. Zero-penalty exit if YOKA misses any of them. We earn the long-term contract by delivering the pilot.

KPI 1

Zero

Missed fuel deliveries

KPI 2

95%+

Fleet availability

KPI 3

100%

On-time haulage moves

30day mobilisation from signed agreement
90days to prove we deliver

All rates and figures on this site are indicative and subject to commercial discussion and negotiation. Final terms confirmed in a signed service agreement.